Grand RIVERKEEPER LABRADOR INC.
GRAND RIVERKEEPER LABRADOR INC.
P.O. Box 569, Station B
Happy Valley-Goose Bay
Labrador A0P 1E0
15 January 2007

The Honourable Clyde Jackman, Minister
Environment and Conservation
Government of Newfoundland and Labrador
West Block, Confederation Building
P.O. Box 8700
St. John's, NL
A1B 4J6

RE : Lower Churchill River Hydroelectric Generation Project (Reg. 1305)

Dear Minister:

The Grand Riverkeeper Labrador, Inc. hereby requests to be listed as a stakeholder in the environmental assessment process of
the Lower Churchill River Hydroelectric Generation Project and that we receive notice of all future meetings and pertinent events
at the address stated above or to the attention of the following: Roberta Frampton Benefiel, Vice President- Telephone #
709-896-4164. or e-mail at refbnfl@yahoo.ca or Clarice Blake Rudkowski, President, -Telephone # 709-896-9530 e-mail
cblake_rudkowski@hotmail.com

We have reviewed the project registration and description documents related to the abovementioned project and offer comments
as follows.

INTRODUCTION
The Grand (a.k.a. Churchill) River is the longest river in Labrador (530 miles - 853 km) and the seventh largest in Canada. It has
the largest watershed in Labrador, draining an area of 36,068 sq. miles (93,415 square km) - an area equivalent to Prince Edward
Island, New Brunswick and almost half of Nova Scotia combined. The western boundary of the Grand River watershed forms
part of the border between Labrador and Quebec as it follows the Height of Land Plateau. It is a river of rivers. Many tributaries
flow into it such as the Cache, Wilson, Pena's, Metchin, Mininipi, Elizabeth, Fig, Tomahaws, Travespine, Valley, Unknown,
Atikonak, as well as hundreds of smaller brooks and streams.

This magnificent waterway is also the most historic and ecologically diverse in Labrador.

A 4,000-5,000 year-old Maritime Archaic site has been found, documenting the earliest known human occupation of the river
valley - around the time the Egyptian pyramids were built. The earliest permanent Euro-Canadian settlement in the Grand River
watershed came in 1743, with the establishment of a series of trading posts. The Grand River was the economic artery for the
whole region, holding great cultural significance for both the Innu and the Metis. By virtue of this fact, it was used to buttress
the Newfoundland case in the Labrador/Quebec boundary dispute of 1927. The GRAND RIVER was called MISHTA SHIPU
(meaning Big River) by the Innu and it is still known by those names locally.

The Grand River watershed spans portions of four ecoregions and provides habitat for rich communities of boreal flora and
fauna. Cliffs as high as 800 ft. (235 m), tower above the deep lower valley creating microclimates that are often 10 degrees warmer
than the upland plateau. This results in ecosystems that are very rich and diverse. The main portion of the lower valley lies
within the High Boreal Forest-Lake Melville Ecoregion hosting the most productive forests in Labrador. Disjunct populations of
plants characteristic of more southerly latitudes have been found along the main river. This boreal river valley is an important
breeding, foraging and wintering habitat for many fur-bearing animals. It is considered an oasis for migratory songbirds. The
river provides a corridor for fish migrating to tributaries for spawning. A total of 16 species of fish have been identified,
including Atlantic Salmon.

This river is Labrador's treasure.

RELEVANCE OF OLD STUDIES AND OUTDATED DECISIONS:
The Proponent will be relying on information from a 1980 Environmental Assessment. We fail to understand how 27-year old
studies can be still considered significant. Many changes occurred and more information became known in the intervening years
so new studies must be done with consideration of this updated information. For example, much work has been done in the area
of greenhouse gas emissions from reservoirs. These new, studies must be considered. Only baseline studies can be accepted as
part of the current project. As well, all studies relating to this project have been conducted and financed by the proponent. The
science could be biased in favor of the project. It may be necessary, therefore, in certain cases, to request further studies by
independent, arms-length organizations. We recommend an independent committee to review all studies currently on file relating
to this project.

SCOPE
From an environmental economics perspective there is a very geographically limited scope of analysis for considering costs and
benefits of development. For example at the bottom of p. 42, of the Project Registration and Description document, where fish
and fish habitat is being discussed, compensation would need to take into account the value placed on the resource by users of
that resource including aboriginal (Innu & Metis) peoples and recreational fishers. In a recent Species at Risk Act (SARA)
benefits survey presented at a seminar by Dr. Murray A. Rudd, Canada Research Chair in Ecological Economics, Sir Wilfred
Grenfell College, one of the main findings was that the proper geographic scope of analysis for considering economic benefits
(of conservation projects) was national, even for relatively little known species. i.e., many people in central Canada, the Prairies
and west coast exhibited preferences that favoured conserving Atlantic species and implied positive (and in some cases very
substantial) economic values for Atlantic species right across Canada. Rudd, M. 2006. Assessing the non-use economic values
of six endangered species in Canada. Presented at Valuing Nature Conference, Corner Brook, NL, 7 July 2006. Similar arguments
about proper scope for considering historical and other ecological benefits could be made as well.

It is clear that this is not just a local or provincial issue. There are larger trade-offs that need to be considered on a national and
even global scale.

GREENHOUSE GAS EMISSIONS (GHG) AND CLIMATE CHANGE
On p. 44 Section 5.1.10 of the Project Registration and Description document, Climate Change and Greenhouse Gases. By the
proponents own admission reservoirs generate greenhouse gases so there must be baseline studies done to quantify current
emissions (before new dams are constructed) in order to be able to determine the net GHG emissions after the addition of two
more reservoirs. With regards to climate change, large increases or decreases in precipitation locally and globally, must be
considered using the Precautionary Principal.

FISH AND FISH HABITAT
According to the Proponent, the project will result in the Harmful Alteration, Disruption or Destruction (HADD) of fish habitat.
Sixteen species of fishes can potentially be impacted or even lost. Only a full Environmental Assessment would address this
issue.

RIVER FLOW
Converting our free-flowing river to a series of reservoirs will have sweeping implications for the hydrology and chemistry of the
river basin and presents one more example of the necessity of a complete EA.

COSTS
Transmission lines to deliver the energy to market are not mentioned in this report. It is impossible to determine the socio
economic effects when a huge portion of the costs are not included.

NEED FOR THE PROJECT AND ALTERNATIVES
Alternatives to damming the river are not considered. If alternatives were examined it may determine there is no need for this
project. Only an assessment by a review panel could determine this.

CUMMULATIVE EFFECTS
In the case of the Lower Churchill Hydroelectric Generation Project, several current and proposed projects and activities will also
affect the watershed of the Grand River and beyond, namely:
1. Millions of gallons of raw sewage being pumped into the river daily.
2. Recently constructed causeway/bridge blocking up to 65% of the river flow.
3. We need an environmental audit of the Upper Churchill Project.
4. Construction of a new transmission line to deliver the power to market.
5. Proposal to suction-dredge mine the riverbed from bank to bank.
6. Climate change

The impacts of each activity combine with the activities of another in a synergistic manner. It is important that we know what
these effects are.

IN A GLOBAL CONTEXT
According to "Dams and Development - A New Framework for Decision Making", the report for the World Commission on
Dams, November 2000: (Partnership, Co Operation and Financing by The World Bank, The World Health Organization, CIDA,
Hydro Quebec, Manitoba Hydro, SNC Lavalin, International Rivers Network, and many others.)
"Consider: on this blue planet, less than 2.5% of our water is fresh, less than 33% of fresh water is fluid, less than 1.7% of fluid
water runs in streams. We dammed half of our world's rivers at unprecedented rates of one per hour, and at unprecedented
scales of over 45,000 dams more than four stories high"

…" Today, around 3,800 km3 of fresh water is withdrawn annually from the world lakes, rivers and aquifers. This is twice the
volume extracted 50 years ago"

… "Large dams have fragmented and transformed the world's rivers modifying 46% of primary water sheds."

Hydroelectric developments change the natural hydrological and nutrient fluxes in estuaries, with negative effects on the plant
and animal communities adapted to them. They change temperature and water chemistry, convert riverine to lacustrine
environments and alter the frequency and duration of daily and seasonal downstream flow regimes. All of which affects people
and communities. More than 400,000 square kilometers - the area of California- have been inundated by reservoirs worldwide.
We will be adding yet another huge project to that legacy, and adding our own negative effects to the already fragmented and
transformed worlds rivers stated above. We have a moral obligation to consider this project in the widest context possible, that
of the effects on global fresh water systems and on the biodiversity of the entire earth.

CONCLUSION
Grand Riverkeeper Labrador Inc. feels that this project is far too significant and too important to the future of Labrador to
proceed without a full examination of the impacts. Grand River is the life support system for Central Labrador and beyond. The
river is of key cultural significance to the Innu and Metis people. The area flooded and the effects on this 93,415-km˛ watershed
will never be recovered. The project will have a legacy in perpetuity. Labradorians deserve the best environmental assessment
for this project, including the most comprehensive assessment of the full economic and environmental costs. Newfoundland and
Labrador Hydro and the Government of Newfoundland and Labrador are asking a lot of the people of Labrador and therefore
they deserve the best possible science, public consultation process and a coordinated effort between the federal and provincial
assessment process. Accordingly we respectively request that the Minister call for a full Provincial Environmental Impact
Statement to be conducted as part of a joint federal and provincial panel review under the Canadian Environmental Assessment
Act (CEAA).

Yours truly,
Clarice Blake Rudkowski, President Roberta Frampton Benefiel, Vice-President
Grand Riverkeeper Labrador Inc. Grand Riverkeeper Labrador Inc.

c.c. Premier Danny Williams, Government of Newfoundland and Labrador., Honourable Kathy Dunderdale, Minister of Natural
Resources, Govt. of NL, Honourable John Hickey, MHA, District of Lake Melville, Honourable Gerry Reid, Leader of the
Opposition, Liberal , Ms. Lorraine Michael, Leader of the New Democratic Party, Mr. William Coulter, P. Eng., Canadian
Environmental Assessment Agency, Prime Minister Stephen Harper, Government of Canada, Honourable John Baird, Minister
of Environment, Gov't of Canada, Honourable Todd Russell, MP for Labrador, Honourable Stephan Dion, Leader of the
Opposition, Liberal, Honourable Jack Layton, Leader of the New Democratic Party, Ms. Elizabeth May, Leader of the Green
Party